Wednesday, September 28, 2011

Missing EV opportunity: Sell Cool

Huffington Post blogger Carol Pierson Holding just got in her friend's LEAF. It's the coolness that impressed. Read it here.

Monday, August 15, 2011

Transmission Losses: Shell tries to halt North Sea oil spill

"An oil spill in the North Sea is estimated to amount to several hundred tonnes, making it the biggest such leak in more than a decade, according to UK Government figures."


"...the energy firm is still trying to "completely halt" any further leakage."


[Source: The Independent]

Monday, August 8, 2011

What's the matter with Costco?

Costco, the big box retailer, has for over a decade been the business with more electric vehicle charge stations in more places around California than any other. Put in service during California's Zero Emission Mandate between 1997 and 2003 when about 6000 EVs roamed the streets, these charge stations have continued supplying power to the RAV4 EVs and other electric vehicles saved by Plug In America when it was known as DontCrush.com, a struggle chronicled in the film Who Killed the Electric Car. Costco's own magazine proudly reported in 2006, just as the film was being released, that 64 stores had a total of 90 charge stations.

Now, Costco has the opportunity, thanks to the California Energy Commission's ReConnect California program with ClipperCreek, to upgrade legacy AVCON charging equipment to J1772 at no cost. As I see it, Costco's noteworthy and foresightful participation in California's earlier electric vehicle program will give them a deserved leg up on all the national retailers now looking into providing electric vehicle charging stations for their customers. While their competition is trenching through concrete and striking costly deals with new businesses long on promises but short on experience, at Costcos a quick swap-out could quickly give them the opportunity to tout the most extensive retail network of EV charging stations.

It seems, however, that Costco has chosen to look this gift horse in the mouth. The company has refused to consider the CEC grant to upgrade their charge stations for free. And it has actually begun to take out the chargers that it has, despite the fact that they have been used a lot by their own customers. Just take a look at an evchargermaps.com entry for a Costco with chargers. For example, the Mountain View location, a place I've charged and shopped at a few times a year since 2004. It has 44 reports going back to 2008. And dozens more going back to 2003. (This doesn't include every time someone charged, merely the times a driver made the effort to confirm the condition of the charger for other drivers.)

It has been reported that some store managers would rather not be removing chargers right when we see plug-in cars coming to market. Providing charging fits well with the company's sustainability efforts, including both the physical stores and the products they sell.  President and CEO Jim Sinegal touts Costco as "one of the early companies to embrace many of the earth-friendly technologies, such as skylights and recycling" in it's Corporate Sustainability Report from 2009. 

Why Costco isn't embracing their early support for plug-in cars now that the rest of the world is jumping in is beyond me. Given that it will actually cost the company more money to say no than to say yes makes this a no-brainer for me. It should for Costco as well.


Wednesday, July 13, 2011

Keepin' it simple

Plug-in cars are being delivered at long last. Yet there remains confusion about the necessary infrastructure and its expense. Electric Vehicle Service Equipment (EVSE) home wall units are priced at between about $1000 and $2500. Plus installation. Need it cost this much? Is it as complex and time-consuming a process as has been experienced by many new owners of plug-in cars?


All plug-in cars these days come with a 120-volt charge cord. This will actually be sufficient for many if not most Volt drivers, and quite a few LEAF drivers. An empty Volt pack will take 10 hours to fully recharge; an empty LEAF about 20 hours. That may seem like a long time, but the relevant questions are: How long will the car be sitting anyway? Until the next morning or just an hour or two? How full is the battery when it gets parked? And where are you going next?


For most folks most of the time, chances are the battery isn’t near empty when it gets plugged in, perhaps at work, perhaps at home after work. Recharge time will usually be much less than what it takes to go from empty to full.


And the cost to the consumer to enable the 120V cordset? If you’ve already got a grounded 120V outlet in the garage or carport, zero. If you need to put an outlet in a convenient place, it would likely cost about $100.


Surprising to many, including I suspect Tesla Motors itself, they found that about half the charging of Roadsters at home in the U.S. is at 120V. Despite the fact that it takes 38-60 hours to charge a Tesla from empty to full at 120V. One can’t presume the peculiarities of a Roadster tell us too much about plug-in cars with much less range, but I think we shouldn’t write off 120V charging just yet, as many involved in readying infrastructure for EVs would have us do. The cord that comes with the car just might suffice for many, especially plug-in hybrids which have smaller battery packs.


Still it remains true that most will want the ability to charge their car at a faster clip at least some of the time, which is what 240V charging stations provide. With the 16 amp charger both cars have today (the actual charger is located in the car, not the box on the wall,) a 240V EVSE takes about four hours to fill an empty Volt pack. It takes about seven hours to fill a near empty LEAF, ensuring a complete charge overnight. If a complete overnight charge is the goal, 120V will still suffice for a Volt, but a 240V EVSE will be essential for most who buy an all-electric car.


Nissan and GM have each had their preferred provider for home charge stations in an attempt to streamline the process, but many customers have had complaints about the cost and scheduling. Dozens of manufacturers seem to be selling equipment at a range of prices, but few actually are available now. The situation for new owners has also been complicated by the various government infrastructure programs, including the DOE-funded EV Project (Ecotality) and ChargePoint America (Coulomb,) which have differing requirements and benefits depending on one's vehicle and location. If eligible, most people accept a free 240V charge station, of course, as I did. My installation was pretty simple, so it cost me nothing. But government support for infrastructure won’t last forever. Coulomb and Ecotality sometime soon won’t be able to leverage taxpayer money to keep other manufacturers at a disadvantage. Quite likely not beyond the current programs.


I am pleased to participate in the EV Project, which came late to the San Francisco Bay Area, and happy to get my tax-payer funded charger and DC Fast port. I believe in government support for electric vehicles (and many other things also on the congressional chopping block at the moment.)


However, for the last month my Blink has been on the blink. Something about firmware, they said. An email on June 8th said they’d get back in touch to schedule a visit. As I write on July 13th I’ve recently been contacted by the contractor who installed the unit, but I’m still waiting for the service call. However, I remain unconcerned. Not because I always charge at 120V mind you. Rather, because I’ve had the 120V cordset provided with the car upgraded to 240V. EVSEupgrade.com offers the upgrade, which allows the Volt or LEAF to charge at their maximum 240V capability of 16 amps. Cost of upgrade: under $300. (For this to work in place of a wall-mounted unit, you still need a dedicated 240V 30 amp circuit and outlet, which would cost a few hundred dollars of an electrician’s time and perhaps $50 in parts.)


The point isn’t simply to plug the good folks at EVSEupgrade.com, although I’m happy to do it. They’ve kept my LEAF juiced, after all. Something Ecotality couldn’t do even with $100 million in federal grant money.


I am not alone in my concern that there is some level of unnecessary complication, excessive cost, and unhelpful mystification going on around electric vehicle infrastructure. It isn’t helpful to the “cause,” those picking up their new plug-in cars or those who are considering it.


For the electric vehicle project, broadly speaking, to be successful, we need to be mindful to keep it simple and keep it cheap. This is not rocket science. We are adding yet another electrical appliance to our ever increasing array of devices, from light bulbs and cell phones to refrigerators and HVAC systems. It needs to be done safely, of course. But it needs to happen. To do it right, the focus needs to be on consumers’ interest. The result will be simple, safe and cheap. Thank you evseupgrade.com for pointing the way.

Thursday, June 30, 2011

Using leverage

To ensure effective and tough federal CAFE standards for 2017-2025, enviro groups are holding on to the California card - the state's right to set its own auto emissions standards - according to Jim Motavalli in the NY Times. Read the full story here.

[Source: NY Times]

Wednesday, June 22, 2011

Think goes down

Think has declared bankruptcy in Norway. Sad.

Tuesday, June 14, 2011

Think in trouble as Norwegian EV market booms

Think, maker of the Think City, is in trouble, Norwegian business newspaper E24 reports. It's not paid it's bills since February, according to Swedish parts supplier AQ Wiring Systems.

At the same time, sales of electric cars are booming in Norway. The iMiev has become the fastest selling car in its segment, beating out gas vehicles. 764 new electric cars were registered in the first five months of the year. During the same period last year, the number was only 123.

[Source: E24]


Thursday, June 9, 2011

From Scooters to High Speed Rail, China is Electrifying

I’m sure I’m not the first to say it. China is electrifying.


When I was studying China and Mandarin Chinese 35 years ago, “Red” China was unrecognized by the US, literally, and dark in a way difficult to imagine now. Who knew what was going on over there? Was “reality” that the world’s oldest civilization was throwing off the shackles of Western domination and its own past to offer a new vision of civilization, or was it bodies floating downriver to Hong Kong during the Cultural Revolution?

Just as today we can look at a nighttime satellite image and see the black void that is recalcitrant, unelectrified North Korea, once that was China. Today China is as illuminated as the rest of the world, and they are carrying electrification further. I can’t cite the government decree, but having just returned from two weeks that took me from Beijing to Changsha, Hunan to Shanghai, it is evident that a national transportation system is being implemented, and electrification is at its core. From two-wheeled scooters, a mainstay of urban mobility, and urban mass transit, to high-speed inter-urban rail, China will soon see the day most people move about most of the time on electricity. Fifteen years ago Shanghai was a city of diesel busses and bicycles. It had few private cars. For a while, gas scooters held sway piled high with people and products. It had no subway system. Today Shanghai has the world’s largest. Smoother and quieter than any I’ve ridden anywhere. And three types of electric busses - legacy trolleys with catenary wires, battery busses, and super capacitor busses. And most of

the scooters are now electric. (And they are headed directly at you, at night, with no headlight.)

Not very many years ago, tens of millions of Chinese packed themselves regularly into unairconditioned, slat-seatted box cars to get to work and visit family during holidays, enduring trips of more than 24 hours. I’m sure there are still plenty of old-school trains about, but today Chinese are boarding comfortable, high speed electric trains coursing on unimpeded raised trackbeds at over 200 MPH between cities large and ever-larger. Last year it took 24 h

ours to go from Beijing to Guangjou. Next year it will take 6 or 7.


With these dedicated high speed electric rail lines crisscrossing the nation, and the huge, attractive new train stations being opened to serve these inter-urban lines, it becomes clear China has decided most long distance passenger travel will be by electric trains. And these trains are being integrated with existing and new subway systems. Step off one system right onto the other.


Cars will undoubtedly be the last piece of the electric transportation matrix in China. The week I was in Shanghai, the Electric Vehicle Test Drive Center opened to the public in Shanghai Automobile City, a far suburb still reachable by subway. Plug-in cars from a half dozen Chinese automakers were on display along with charge stations in an attractive setting amidst a winding course for test drives. The BYD plug-in hybrid I drove performed well. I have no doubt we will see Chinese brands in the US when they are ready to make a move. While I think selling gasoline cars by the tens of millions to the domestic market is perceived to be of prime economic importance, I hope they choose to forgo following the Japanese and Korean model of aggressively competing on the low end in the export market. We really don’t need more cheap gas cars. With some attention to fit and finish, the Chinese could use their low-cost advantages (labor and a huge battery industry) in a market segment that sells at a premium outside their borders. Once EVs are cool in the West, the Chinese domestic market will follow.


China is very much a work in progress. As progressive and foresighted as they seem to be on the transportation front, they’ve got huge challenges ahead regarding electricity production. Largely dependent on domestic coal, cities are smothered in smog. Beijing, which systematically restricts automobile usage and moved a lot of factories out of town for the Olympics, had clearer skies than I expected. But it is an anomaly. Shanghai and Wuhan are enshrouded in poison.


Factories, including a solar panel plant I know of, have had to curtail production because coal can’t be shipped fast enough to supply electricity generation plants. Transportation of freight, including coal, will be relieved by moving passengers off the freight path and on to the growing high speed rail network. But that only postpones the reckoning that will come with the growing power demands of a burgeoning consumer culture.


China may end up with the world’s most efficient electric transportation system powered by the world’s most toxic electrical generation.


We, in contrast, may end up with an efficient, relatively clean, partially renewable electrical grid, while still burdened with a transportation “system” dependent on trucking freight and moving passengers on petroleum.


Sunday, June 5, 2011

The approaching Tesla dry spell

Interesting piece by Katie Fehrenbacher about Tesla and the period of limited revenue that approaches. "...this latest funding underscores how Tesla will be transitioning into a period where the company will be generating a lot less revenue for several months — hence part of the reason it needs to raise more funds now."

Fehrenbacher had thought components sales might provide a backstop until the Model S appears, but points to the recent S-1 filing. "Tesla doesn’t have any signed agreements for powertrain component sales after 2011." As interesting for what it says about Toyota. There's no evidence yet of a deal beyond 2011 regarding the heralded, new RAV4 EV. And Daimler is committed to German batteries going forward for Smart and Mercedes, and has a deal with BYD for China.

Tesla has weathered dry spells before with Elon Musk's money, as it appears will be the case again.

[Source: GigaOM)

Friday, June 3, 2011

Transmission Losses: 4 killed in Chevron UK refinery blast

The Independent reports four workers at the Chevron refinery in Wales were killed yesterday in what is being described as a "tragic industrial accident"....
Billowing black smoke gushed from the refinery and spread across the sky in what some have described as a "mushroom cloud"....


Tuesday, May 31, 2011

Fukushima oil spill and explosion

A oil spill has been detected, and another explosion occurred, at Japan's crippled Fukushima nuclear plant, here.

How Japan uses public works projects, including gyms and swimming pools, to buy acquiescence for its nuclear projects, here.

Monday, May 30, 2011

Atomkraft? Nein, Danke.


Germany calls it quits on nuclear power.

Last plant to close in 2022.
Today about 25% of Germany's electricity comes from nukes.

The U.S. gets just under 20% of its electricity from nuclear.

Friday, May 27, 2011

Thursday, May 26, 2011

War is Peace dept.

It seems in Foxland if Obama didn't cause the problem, George Bush found the solution. Check out "George W. Bush -- Father of the Modern Electric Car?"

Read more: http://www.foxnews.com/opinion/2011/05/26/george-w-bush-father-modern-electric-car/#ixzz1NWHup7DX

Tuesday, May 24, 2011

Missed Charge Station Opportunity in San Francisco

ClipperCreek, an Auburn, CA based manufacturer of electric vehicle charging equipment, has just announced the shipment of its 5,000th unit. Some of those units are being paid for by a California Energy Commission grant to upgrade existing Avcon charging stations across California.

Seventeen Avcons eligible for replacement are located at San Francisco city-owned parking lots. With the city budget constrained just as investment in EV charging infrastructure has become warranted, one would think the City would jump at the opportunity for seventeen n0-cost new units to serve LEAFs, Volts and Teslas now. These ClipperCreek chargers would be simple to use - just park and plug in. No card to swipe, no phone call to make, no network to join. Just as they have been for over ten years.

Instead, the Department of the Environment has opted to utilize a federal grant to Coulomb Technologies' ChargePoint America to pay to upgrade these charge stations. What's the problem? The CEC grant is restricted to the replacement of legacy units. $50,000 to $100,000 was left on the table. The Coulomb grant could have been utilized anywhere. The City has sacrificed early expansion of charging beyond the downtown core which today contains the lion's share of the charging stations.

There were undoubtedly considerations beyond the mere efficient use of available public resources involved in the choice made. Coulomb touts the sophisticated capabilities of its "networked," revenue-producing solution, but it is only one of numerous business models for EV public charging. With the ClipperCreek/CEC chargers, for example, the City wouldn't be on the hook for ongoing networking charges with Coulomb once the federal grant runs dry in a year or two. Will there be enough usage of a pay-to-charge statioin to justify the annual fee to Coulomb?

Once there are enough cars and enough public infrastructure, we'll begin to understand what will best serve drivers and the development of useful public charging at appropriate charging levels. Might be a monetized, networked system. Might look quite different. The ubiquity of electricity offers many options if the playing field stays level. Consumers will decide.

It seems obvious to me that government ought not prematurely buy into a "business plan" when we mean to buy charging stations. Especially when the opportunity presents itself at no cost to the City and greater simplicity of use for consumers.

Friday, May 6, 2011

iMievs do their bit in Japan

Mitsubishi iMievs have played a roll in the petroleum deprived region around Fukushima. New York Times Wheels blog has the story. The picture tells the story.


Friday, April 29, 2011

Downtown South San Francisco electrified

Four electric vehicle charging stations were unveiled today at a new parking structure in downtown South San Francisco. The Coulomb J-plug/120V units were installed under grants to ChargePoint America (DOE and CEC money). For the time being, there is no charge for either the parking or charging for vehicles that plug in.

The opening of the new parking garage and office complex one block off Grand Avenue was a big deal. Miller Avenue was blocked off as dignitaries gathered to celebrate the
delayed opening of this large project for
this small city in the shadow of San Francisco. Hoping the parking will contribute to the revitalization of
Grand Avenue, SSF now offers a convenient spot to stop for a bit of juice just off 101. Lots of
restaurants, a Peets coffee, and many banks and shops are within a few blocks. If you've always driven past the Grand Avenue exit, pull of the highway, plug in, check it out.

One caveat to an otherwise positive report. With very limited signage, and a prime location right by the entrance, we'll have to see how long before these spots begin to be ICED.

Thursday, April 28, 2011

More SF Bay Area Charge Stations....some work

Once again, charge station serendipity.
I arrived a couple of days ago at the parking garage beneath One Montgomery Tower in the LEAF with Peter Van Deventer, Dutch EV guru, and a couple of professors from Holland. Jay Friedland, Plug In America Legislative Director, followed in a RAV4 EV with some more profs, who had come to learn about California's EV efforts. Lo and behold, we spy two Coulomb J-plug/120V units, one with a plug-in Prius conversion plugged in. I waved my Coulomb card only to find the unit gave us a fault and wouldn't release the J-plug. The other unit however, was in working order and I plugged the LEAF in.

As we walked away, pleased to have given this unexpected real-world demonstration of public charging to the visiting Dutch scholars, we saw a Tesla plugged in to a
random 120V outlet. Believe it or not, and we didn't, there were two plug-in cars in the lot before we even arrived!

Later I checked, and the charge stations do appear on the Coulomb/ChargePoint America maps. They are listed as "Not Available" and "Free." (This is of course a pay garage.) I suspect the map hasn't caught up to reality on the ground.

Last week I went to the opening of the charge stations at a new San Rafael municipal pay lot at 900 C St. Two Coulomb J-plug-only units located right by the entrance. A grand opening ceremony attended by the mayor saw many EVs, although only one could charge at a time, as one unit here didn't work either. Furious phone calls during the event couldn'tget the machine to allow the juice to flow after waving the Coulomb Card.

We'll see how this all plays out, but in the short term, the added technical complexity of these charge stations that require activation with RFID cards dependent on
remote connections not only add a barrier to usage they present another point of potential failure. For now, drivers and the EV project broadly speaking, would be better served if one could confidently arrive and simply plug-in, as you can at some charge stations - public chargers upgraded to J-plugs, for instance. Like the one I used yesterday at the Vallejo Ferry Terminal. Once The EV Project (the other DOE-funded program) charge stations begin to appear (hello Ecotality, anybody home?), will Coulomb cards work, or will drivers need to collect every network's proprietary card?

Now I learn from fellow LEAF driver and long-time EV driver Danny Ames (he loved his Th!nk
City, too, and also built a conversion) of yet more ChargePoint America charge stations. A brand spanking new South San Francisco municipal parking garage one block off Grand Ave. sports four J-plug/120V units. Three are currently listed as "Available" and "Free." (Metered pay parking.) One is "Not Available." (I won't presume why.) There's a great Korean restaurant near there. I'll visit soon.

Sunday, April 24, 2011

FIRST-EVER plug-in prius! Really?

A story on Toyota's announcement that an ordering system for the plug-in prius will be coming later this year prompted me to check out the site. I find it rather funny and rather sad.

"THE FIRST-EVER prius plug-in hybrid," it says. Really? Ask Felix Kramer of CalCars. Ask any of the hundreds of individuals and fleets driving around in prius converted to have plug-in capability.

It's not even Toyota's first plug-in prius. They've been showing variants around for more than two years. The only thing that's "first" about it is that they will have a system for selling them sometime later this year in a baker's dozen states give or take.

Also headlined on the website: "the prius everyone's been waiting for." That they got right. Their own customer polling a long time ago showed a plug was at the top of Prius drivers' wish lists. Surely there's a market for their plug-in hybrid. But the bar has been raised in two unexpected directions. Nissan has begun to put a real all-electric car on the market. And GM has extended the electric range expectation for a plug-in hybrid before Toyota's even in the game.

Toyota has passed on the opportunity to be the plug-in leader, given up the lead they'd accrued from the RAV4 EV and the Prius as much as GM postponed its rendevous with destiny when they jettisoned the EV1. Someone from Toyota once told me they are "never first, always best." Time will tell.

Tuesday, April 19, 2011

Who knew, part 2, 120V edition

Some more places to plug in. SFO now has 120V plugs available in each of its public parking garages. You'll need to provide your own cable; of course every new EV comes with one.

Airports are one of the places 12oV makes lots of sense. Most cars sit for many hours, some for days at long-term parking. And it's very cheap to install, probably less than 10% the cost of a Level 2 unit.

A few Level 2 charge stations would be useful in short-term parking, as well.

And more importantly, I'd suggest a DC Fast Charger, perhaps at the Cell Phone lot. The airport is a crossroads, and folks with an EV driving over 40 miles to pick someone up at SFO could charge up quick allowing them to not use a gas car.

Well done, SFO!